Erection & Servicing
Descriptions
Fabco Engineers handles site erection of boilers and steam systems from foundation coordination through final commissioning, along with ongoing servicing to keep plants running reliably.
Complete Erection And Servicing Process
Our field teams work to strict safety and quality procedures whether erecting a new installation or overhauling an existing system, minimising downtime and ensuring every component performs as designed.
- Site foundation coordination
- Boiler and vessel erection
- Piping and structural installation
- Commissioning support
- Preventive maintenance visits
- Overhaul and repair work
- Spare parts replacement
- Performance troubleshooting
- Trained erection crews
- Documented safety procedures
- Quality inspection at every stage
- Post erection testing
Other Services
Get a free quote?
Why Choose us
Your Trusted Partner For Erection And Servicing
Our erection crews bring decades of hands on experience installing boilers and steam systems safely.
We plan erection and servicing work carefully to reduce disruption to your ongoing operations.
From site erection to servicing and troubleshooting, we manage the complete scope in house.
Three decades of hands on plant erection and servicing experience across Bangalore and South India.
Common Questions
Erection And Servicing Frequently Asked Questions
Fabco Engineers erects, aligns, services and overhauls industrial plant across Karnataka. Boilers, pumps, blowers, heat exchangers and the structures that carry them.
We handle boiler erection and commissioning Bangalore factories need done inside a live production environment, where the constraint is rarely the engineering and almost always the schedule.
Erection is where specifications meet reality
Equipment arrives correct on paper and still fails to perform if it is installed badly. Foundations that are not level transmit stress into the shell. Misaligned pumps destroy bearings and seals within months. Pipework pulled into position rather than fitted leaves permanent load on flanges. Poorly grouted bases transmit vibration into the building.
None of this shows up on the day of handover. It shows up six months later as an unexplained failure, and by then it is treated as a maintenance problem rather than an installation defect.
Our crews are directly employed and supervised on site. We do not subcontract erection to whoever is available that week, because consistency of workmanship is the entire point.
What the scope covers
Receipt and inspection. Checking equipment against the packing list and for transit damage before anyone signs, which matters when a claim depends on it.
Foundations and grouting. Coordination with civil work, levelling, shimming and grouting to the manufacturer’s tolerance rather than approximately.
Mechanical erection. Setting boilers, pumps, blowers, tanks and exchangers in position, with rigging planned rather than improvised.
Alignment. Laser alignment of rotating equipment. Coupling misalignment is the most common cause of premature bearing and seal failure, and it is entirely preventable.
Piping and connections. Steam, feed water, blowdown, fuel and drain lines connected without imposing strain on equipment nozzles.
Electrical and controls. Panel positioning, cabling, instrument connection and loop checking with your electrical contractor.
Testing. Hydraulic testing, safety valve setting, interlock and trip verification before anything runs under load.
Commissioning. Controlled first firing, load testing, tuning and handover with your operators present and trained.
Commissioning done properly
Commissioning is not switching a plant on. It is a staged process of proving each system in isolation, then together, under increasing load, with somebody watching instrumentation who knows what the numbers should read.
We verify combustion and tune it, confirm every safety interlock actually trips, check water chemistry and dosing, and log baseline performance so future deterioration is measurable. A plant handed over without baseline figures gives you nothing to compare against when efficiency drifts.
For registered plant, boiler erection and commissioning Bangalore inspectors will sign off requires the documentation trail to be complete before they attend. We prepare it in advance rather than scrambling on the day.
Servicing and overhaul
Running plant needs periodic attention that goes beyond routine maintenance. We carry out annual inspection preparation including opening, cleaning and presenting the unit, tube cleaning and descaling, refractory repair and replacement, safety valve overhaul and recertification, pump and blower overhaul with bearing and seal replacement, and burner servicing and combustion tuning.
Most of this work has to happen in a shutdown window that production wants as short as possible. Planning and parts availability decide the duration far more than manpower does. We plan the sequence, stage the spares beforehand and start with everything on site.
Shutdown work
Annual shutdowns are where a year of deferred work gets compressed into a few days. The plants that come through them well are the ones that scoped the work weeks earlier, ordered parts against a defined list and sequenced tasks so trades were not waiting on each other.
We do that planning with you. Where a job genuinely does not need a shutdown, we say so, because unnecessary downtime is expensive and nobody thanks a contractor for it afterwards.
Planning an installation around production
Scheduling boiler erection and commissioning Bangalore factories can absorb is usually the real challenge. The hardest constraint on most jobs is not technical. It is that the factory cannot stop. We have installed boilers alongside running lines, cut steam over during a single night shift and staged work across consecutive weekends because a continuous shutdown was not commercially possible.
That kind of sequencing needs deciding at quotation stage, not discovered halfway through. We ask early what your production calendar allows, what a lost shift actually costs and whether temporary capacity is worth hiring. Sometimes bringing in a hire boiler for a fortnight costs far less than the downtime it avoids, and it is worth doing that arithmetic before committing.
Access is the other thing that catches projects out. Getting a boiler into a building that was constructed around the previous one is a genuine engineering problem. We survey the route, check floor loading, plan the lift and identify what has to come apart before anything is delivered rather than after.
Working with equipment we did not supply
A large share of the boiler erection and commissioning Bangalore plants ask us to take on involves equipment bought elsewhere, occasionally imported and occasionally second hand. We are happy to install any make.
For used equipment we will inspect before you commit to buying where possible. Refurbished plant can be excellent value, but the condition of pressure parts, the availability of documentation and whether it can be registered under IBR are decisive. Those questions are far cheaper to answer before purchase than after delivery.
Breakdown attendance
Equipment fails at inconvenient times. We attend breakdowns on plant regardless of who installed it, diagnose properly rather than replacing parts speculatively, and give you a straight answer about whether the sensible response is repair, overhaul or replacement.
AMC clients receive priority attendance with an agreed response time and a service history for every machine, so whoever attends already knows what was last done and what was flagged.
Handover documentation
You should finish a project holding as built drawings, alignment records, hydraulic test reports, safety valve certificates, commissioning data with baseline readings, and a maintenance schedule with intervals. We compile this as the work proceeds so it is complete at handover rather than promised afterwards.
Who we work for
Parle, Althera, Cothas Coffee, Akshaya Patra, Micro Labs, VH Group, Arvind Fashions, Pioneer Laundry and Swastiks. Working in food and pharmaceutical plants means hygiene protocols, documented procedures and behaviour standards that carry into every site we attend.
Safety on site
Our people work inside operating factories alongside your staff. Hot work permits, isolation and lockout, confined space procedure, working at height and lifting plans are followed because the alternative is unacceptable, not because a client is watching.
Discussing your requirement
Whether you have equipment on order, a shutdown to plan or a machine that has never run properly since it was installed, start with a site visit. For boiler erection and commissioning Bangalore plants can schedule around, call Fabco Engineers or send your requirement through the enquiry form and we will respond with a specific plan.