Industrial chimney fabricated and erected by Fabco Engineers in Bangalore

Chimney Fabrication And Erection

Design, fabrication and erection of industrial chimneys and flue ducting for boilers, furnaces and process plants.

Descriptions

Fabco Engineers designs, fabricates and erects self supporting, guyed and braced industrial chimneys, along with the flue ducting that feeds them, sized to give your boiler the draught it actually needs.

Complete Chimney Fabrication And Erection Process

From draught and height calculation through fabrication, foundation coordination, lift planning and site erection, we handle the full chimney scope so your stack is correctly sized, safe and compliant.

Why Choose us

Your Trusted Partner For Industrial Chimney Fabrication

Correct Draught Calculation

Stack height and diameter calculated for your boiler and fuel, not copied from the last job.

Engineering Led Fabrication

Plate thickness, material grade and corrosion allowance specified for your flue gas conditions.

Planned Safe Erection

Lift plans, crane positioning and sequenced erection so stack work stays safe in a live plant.

30 Years Of Trust

Three decades of chimney, boiler and structural work across Bangalore and South India.

Years of Experience
0 +
Projects Delivered
0 +
Client Satisfaction
0 %
Clients Served
0 +
Common Questions

Chimney Fabrication And Erection Frequently Asked Questions

Height comes from the draught your boiler needs, the flue gas volume and temperature, the height of surrounding buildings and the Pollution Control Board minimum for your fuel and capacity. We run that calculation before quoting rather than matching whatever stack is already standing on site.

A self supporting stack carries wind and dead load through its own shell into the foundation, so it needs no guy wires but heavier plate and a larger foundation. A guyed stack is lighter and cheaper on material but needs clear ground for anchor points and periodic tension checks.

A straightforward stack of moderate height is usually fabricated in two to three weeks and erected in one to two days once the foundation has cured. Refractory lined and taller stacks take longer. We confirm dates after the site survey rather than before it.

Usually yes. We fabricate the new stack and prepare the foundation while the old one is still in service, then carry out the changeover during a planned outage measured in days rather than weeks.

Yes. We inspect existing stacks for shell thinning, weld condition, guy tension, foundation bolt corrosion and lining damage. Where a stack is repairable we repair it, and where it is not we say so plainly.

Fabrication and as built drawings, material test certificates for the plate, welder qualifications and weld test records, the coating specification with dry film thickness readings, foundation bolt details and the height calculation.

Industrial Chimney Fabrication And Erection In Bangalore

Fabco Engineers takes on industrial chimney fabrication and erection for boilers, furnaces, thermal fluid heaters, DG sets and process ovens across Bangalore and South India. Plates are rolled and welded in our workshop, sections are dressed and painted before they leave, and our own erection crew sets the stack on site. Keeping fabrication and erection under one roof matters more than it sounds. A stack fabricated by one party and lifted by another tends to arrive with flange holes that do not line up with the foundation bolts, and the argument that follows is expensive.

Chimney Types We Build

The right configuration depends on height, wind loading, available ground area and the flue gas itself.

  • Self supporting steel chimneys, which carry their own load through a base plate and anchor bolts and suit heights up to roughly 30 metres
  • Guyed chimneys, where wire ropes anchored to ground blocks steady a lighter shell, useful where the budget is tight and space allows
  • Braced chimneys supported off an adjacent building or structural frame, common in congested plants
  • Refractory lined and acid resistant stacks for aggressive flue gas, particularly on solid fuel and waste heat applications
  • Flue ducting, breeching, dampers, expansion bellows and cyclone or multiclone connections

Height And Draught Are Calculated, Not Guessed

Stack height is a regulatory question and an operating one at the same time. The Karnataka State Pollution Control Board sets minimum heights tied to fuel type and thermal capacity, and those minimums are a floor rather than a design. We calculate the height your equipment actually needs from flue gas volume, temperature, permissible velocity and the natural draught the boiler expects to see. Undersize the stack and the furnace struggles for draught and the plant burns more fuel than it should. Oversize it and you have spent money on steel and foundation that does nothing.

Exit velocity is worth attention too. Too low and flue gas drifts back down over the plant on still days. We aim for a velocity that clears the boundary layer around nearby structures without pushing pressure drop up unnecessarily.

Material Selection And The Acid Dew Point

Most stack failures we are called to repair are corrosion failures, not structural ones. When flue gas cools below its acid dew point inside the shell, sulphuric acid condenses on the metal and eats it from the inside, usually starting near the top where gas is coolest. Plain mild steel on a sulphur bearing fuel will not last. Depending on the fuel we specify heavier shell plate in the upper sections, corten or stainless liners, acid resistant internal coatings, or external insulation and cladding to hold the gas above dew point along the full height. We would rather explain this before the order than quote you a repair three years later.

Foundations, Fabrication And Lifting

We prepare the foundation loading data your civil contractor needs, including base moment, shear, anchor bolt pattern and template drawings, and we check the bolt setting before the pour rather than after. In the workshop, plates are rolled, longitudinal and circumferential seams are welded, stiffeners and cleats are attached, and the shell is checked for ovality and straightness. Ladders, rest platforms, lightning protection, aviation warning lamps, sampling ports and the monkey ladder cage are all fitted before painting, because working at height on site costs several times what the same work costs on the shop floor.

Erection is planned as a lift, with crane capacity, boom radius, ground bearing and exclusion zones agreed in writing before mobilisation. Tall stacks are assembled in sections and joined at height with full penetration welds where the design calls for it. Every industrial chimney fabrication and erection job we run has a documented lift plan, and no crew of ours works from a verbal arrangement.

Inspection, Repair And Replacement

Stacks already standing need attention as well. We carry out visual and thickness surveys, verify anchor bolt condition and grout integrity, check guy rope tension, replace corroded upper sections, reline refractory, and repaint with high temperature systems. On several plants around Peenya and Bommasandra we have replaced only the top third of a stack and left the sound lower shell in place, which is a fraction of the cost of a new chimney and takes a shutdown of days rather than weeks.

Statutory Compliance

Your consent to operate depends on the stack meeting the conditions in it. We build to the height stated in your consent, provide the sampling port and platform positions that inspectors expect to find, and hand over fabrication drawings, material test certificates, weld records and paint specifications for your compliance file. If your existing stack falls short of the current condition, we will tell you what has to change to bring it in line.

Industries We Work For

Our chimney work runs across dairies, food and beverage plants, distilleries, pharmaceutical units, textile processing houses, rubber and rice mills, foundries and hospitals. We work throughout Bangalore including Peenya, Bommasandra, Jigani, Attibele, Hoskote, Nelamangala, Bidadi and Dabaspet, and travel to Hosur, Mysore and Tumkur regularly.

What A Site Visit Covers

We do not quote industrial chimney fabrication and erection work from a phone call. An engineer comes to your plant, measures the existing duct route, checks what the boiler or furnace actually produces, looks at the ground conditions where the foundation will sit, and works out how a crane can reach the position on the day. Overhead power lines, adjacent roofs, gate widths and the turning circle inside your compound all decide what is possible. Half the stacks we are asked to replace were put up without anyone asking those questions, which is why the access ladder ends at a wall or the sampling port sits where nobody can stand.

How Long The Work Takes

A straightforward self supporting stack of moderate height usually runs four to six weeks from approved drawings to handover, with the workshop phase overlapping your civil work. The foundation needs its curing time and that sets the earliest erection date, so we start rolling plate while the concrete gains strength. Replacement of an existing stack is quicker in the workshop but tighter on site, because the old shell has to come down and the new one go up inside whatever shutdown window your production allows. We plan those jobs in hours rather than days and tell you honestly whether a weekend is enough.

What You Pay For

A chimney quotation from us separates the shell, the internal lining if any, the access and safety fittings, the foundation steel and bolts, the paint system, transport, crane hire and erection labour. Seeing it broken out lets you compare like with like when you have another offer on the table, and it lets you decide, for example, to reuse a sound foundation or defer an aviation lamp until the aviation authority actually asks for one. Round figure quotations hide choices you should be making yourself.

Ask For A Site Visit

If you are installing a new boiler, replacing a corroded stack or trying to close out a pollution control observation, call us and we will come and look. You will get a written proposal covering industrial chimney fabrication and erection with the height calculation behind it, the material specification, the lift method and a firm price. Reach Fabco Engineers on +91 90365 64886 or fabcoengr24@gmail.com.